| Product Name | PV-Storage Hybrid System | |
| Model | ESS-30kW-128kWh-C1 | ESS-60kW-128kWh-C1 |
| AC side (off-grid/on-grid) | ||
| Rated AC power(kW ) | 30 | 60 |
| Maximum power(kW) | 33 | 66 |
| Rated current(A) | 43.5 | 87 |
| Rated voltage(V) | 400/230 | |
| Wiring method | 3P4L | |
| Grid voltagerange | -20% ~15% | |
| Rated power grid frequency Hz | 50/60 | |
| Total currentharmonicdistortion rate(%) | <3 (rated power) | |
| Power factor | -1~1 | |
| Photovoltaic input | ||
| Rated power (kW) | 19.2*2 route | 19.2*4 bus route |
| Maximum PV voltage | 850V | |
| PV start-up voltage | 250V | |
| MPPT voltage range | 200V ~ 800V | |
| MPPT Channels | 2 | 4 |
| Battery parameters | ||
| Cell type | LFP 314Ah (Optional configuration) | |
| Rated capacity (kWh) | 96~128 | |
| Charge and discharge power Cycle life |
0.5P | |
| Cycle life | 8000Cycles@70%DOD/25 C/0.5C | |